At any point, the break structure of a program can be modified, but only if Cue Sheets is being used. To do so, click on Sales and select Adjust Break Structure. The following screen will appear. From the drop down box, select the program that needs to be adjusted

The program will appear along with the length and the avails. In the example below, “Great Late Movies” has 40 seconds/avails within each break.
![]()
